The CK-1325 CNC Wood Router Machine Installation Tutorial

The CK-1325 CNC Wood Router Machine Installation Tutorial

  • Apr 11, 2026

CATEKCNC's CNC routers support both fully assembled and disassembled shipping. Choosing disassembled shipping can significantly reduce your freight costs, allowing you to acquire high-quality equipment at a much lower total investment.

We understand that many customers may find the setup process daunting upon receiving a disassembled machine. To address this, we have filmed this step-by-step assembly guide using our best-selling Standard 1325 CNC Wood Router as an example.

Please follow the steps in this video to complete the assembly. Once installed, you can refer to our operational tutorial videos to learn how to use the machine. If you encounter any issues during the installation process, please feel free to contact us at any time.

Video Timestamps

00:00 Machine Components Overview

00:14 Installing the Bed Support Beams

01:49 Installing the Worktable

02:30 Installing the Gantry Uprights

02:37 Installing the Hard Limits (Y-axis)

03:55 Installing the Gantry Beam

04:21 Installing the Machine Head

04:36 Installing the Hard Limits (X-axis)

04:46 Installing X-axis Transmission System

05:01 Installing the Spindle Mount and Spindle

06:57 Installing the Y-axis Drive & Transmission System

07:51 Installing the Machine Enclosure

08:57 Installing the Cable Carrier Brackets

09:41 Routing Cables into the Control Cabinet

10:22 Installing the Cable Carrier (Y-axis)

11:28 Installing the Cable Carrier (X-axis)

12:11 Connecting Motor Cables and Lubrication Lines (Y2-axis)

14:13 Connecting the Motor Cable (Z-axis)

15:03 Connecting the Motor Cable (X-axis)

15:36 Connecting Oil Lines to the Manifold

15:58 Installing the Machine Head Enclosure

18:17 Connecting the Water Cooling Lines

18:28 Connecting the Lubrication Lines

18:35 Connecting the Spindle Power Cable

18:50 Installing the Spindle Enclosure

19:41 Installing the Motor Enclosure (Y2-axis)

19:59 Connecting the Main Lubrication Line

20:10 Wiring the Lubrication Pump

21:15 Connecting Motor Cables and Lubrication Lines (Y1-axis)

23:09 Installing the Motor Enclosure (Y1-axis)

23:36 Installing Side Dust Strips

23:48 Final Machine Assembly Showcase